5MWp Solar Farm with the total cost investment of RM46 Million is located at Alor Gajah, Malacca Malaysia. The most visible landmark is the multinational company name Auto Sun Power (one of the world well known solar producer) is just situated next door of solar farm.

Total Cost Investment as shown as below:

Solar PV System   :RM38 Million
Infrastructure        :RM 2 Million
Land Cost             :RM 6 Million

Kumpulan Melaka Berhad (KMB) is wholly owned by State Government of Malacca. The owner of solar farm had commissioned and started to export the power to Malaysia Utility (TNB) via Feed in tariff since 11 April 2013 for Phase 1 (1.30MWp), 16 May 2013 for Phase 2 (1.22MWp) and 02 August 2013 for Phase 3 (2.48MWp).

The Feed in tariff rate : RM0.9016/kwh for period of 21 Years FIAH capable to produce average estimates energy of 6,162Mwh per year, 514Mwh per month ,or 17Mwh per day.

The highest recorded data collection per/day was on 07 October 2013= 27,569Kwh or 28Mwh.

Year of Return Investment : 12 Years

How many staffs working in Malacca Solar Farm?
For normal day to day operation, there are only two staffs working for preventive maintenance tasks such as cleaning solar panels and trouble shooting electrical problems, etc. I cant imaging  20,850 units x 240Wp Poly Crystalline Solar Panels are well maintenance by two highly efficient staffs! Thumb up!


The above technical information based on KMB's solar farm (Design, Supply, Delivery, Installation and Commissioning of Grid Connected PV Solar System) brochure. 