Sunday, July 15, 2012

Registered Electrical Energy Manager

Any installation which receives electrical energy from licensee or supply authority with a Total electrical energy consumption equal to or exceeding 3,000,000 kWh as measured at one metering point or more over any period not exceeding six consecutive months is required to appoint or designate a registered Electrical Energy Manager under Malaysia Energy Commision Regulation (Regulation 16).

No comments:

Post a Comment