Sunday, June 30, 2013

How Much i can earn from Solar Power (Feed in Tariff) During Cloudy Day?






How much I can earn money from Solar Power  via Feed In Tariff during cloudy day?

There is significant reduction of solar power generation during cloudy day.
Based on my record ( 30 Jun 2013), 4kwp solar power only produces  13 units (KWh) and it translates to 13x RM1.30=RM 16.90 income for the owner.

From my observation, the hottest day with clear sky capable to produce up to 19 units (29 Jun 2013) and average is approximately 16 units per day.


Other related Write up

Has Haze Affecting My Solar Power Income?


Sunday, June 23, 2013

Has Haze Affecting My Solar Power Income?

clear sky during sunny day (Solar power produces average 16kwh per day)


Today is the worst haze day in Malaysia including Johor hitting up to API (air pollution Index) to 750 point (very dangerous level). Our Kajang located in Selangor also bad affected by haze pollutant from Indonesia illegal forest burning activity and all schools in Selangor Kuala Lumpur will close tomorrow (refer to news The Star Click here.

Do you know how the haze will affecting our solar power  production on our rooftop (feed in tariff)?

This total 4kwp solar panel produces average of  16units (kwh) per day (for a typical sunny day).
Severe Haze has bring down the visibility of the sun light to the rooftop and the solar production had reduced to 14 units (kwh) today. We can see 12.5% income and solar power generation drop!!

Monday, June 17, 2013

Japan's Most hi-Tech Bicycle Parking

Japan's Most hi-Tech Bicycle Parking

click the line below.

https://www.facebook.com/photo.php?v=597925063565250

Comment: It is so amazing. This bicycle parking using  "vending machine concept" and safe keeping all bicycles in neat and safely manner!!

Monday, June 10, 2013

Financing package for individual to install PV system-Fit

Today Energy, Green Technology and Water Minister Datuk Seri Maximus J. Ongkili has launch Alliance Bank's Home Complete Plus Solar Panel Financing scheme at the Sustainable Energy Development Agency (Seda) office here Monday.


This is the first financing package from local bank to individual to install PV system on their rooftop.

Find out more at Bernama new:

http://www.bernama.com/bernama/v7/sp/newssports.php?id=955037

steps to apply Home complete Plus solar panel financing scheme in Chinese media (Nanyang)

安装家庭太阳能发电系统 银行融资可高达90%

Thursday, June 6, 2013

Honda hybrid battery to cost up to 52pc less

KUALA LUMPUR: Honda Malaysia Sdn Bhd announced a price reduction of up to 52 per cent for a replacement hybrid battery and an extended warranty of up to eight years, with unlimited mileage, for all Honda Hybrid models, effective June 1.

The extended warranty period applies retrospectively to customers who had purchased their hybrid vehicles between January 2011 and May 2013.

Managing director and chief executive officer Yoichiro Ueno said yesterday the company is able to lower the battery prices due to lower logistics and administrative expenses from enhanced business efficency.

"The depreciation of the yen against the ringgit has reduced the cost of hybrid batteries, which are fully imported from Japan.

"Thus, we have taken the decision to reduce the price of the hybrid batteries and extend the warranty period," said Ueno.

He said the company has been constantly studying the market and taking customer feedback into consideration.

"We have learnt that the two main concerns of customers in accepting hybrid vehicles are the hybrid battery's lifespan and its replacement cost," he added.

Owners of the Honda hybrid family, including completely knock down (CKD) and completely built up (CBU) Jazz Hybrid, Insight, CR-Z and Civic Hybrid, will benefit from this offer, he said. Bernama

Read more: Honda hybrid battery to cost up to 52pc less http://www.btimes.com.my/Current_News/BTIMES/articles/GODOS/Article/index_html#ixzz2VR89tTV1